Location:
Old Town Quay, Portadown

Client:

Armagh, Banbridge & Craigavon District Council

 

Project Range:

£ 500K - 1M

Old Town Quay, Portadown

Project Details

Old Town Quay Redevelopment was a key item for the development of tourism in the area. It is also now a local landmark, finished to a high standard at the gateway to Portadown. Contract was for Environmental Improvements to Old Town Quay and included;

 

• Supply & Installation of 2 new floating pontoons and access ramps including driven piled fixings into river bed.

• Supply and Installation of new service bollards on floating pontoons to provide light, power, water, fire fighting and safety equipment for users including trenching and ducting services

• Concrete walling to sides of existing slipway and rock armouring to river banks

• Creation of new car park including kerbing and drainage

• Creation of new reinforced grass area for trailer park including kerbing and drainage

• Creation of hard surfaced paths to pedestrian areas

• Supply and Installation of lighting columns, street furniture, boundary railings, riverside railing, seats, bins, picnic tables and signage.

• Soft landscaping works, importing of topsoil, grassing and planting

• Removal of large mound between car park and river and disposal of material off site.

 

 

G.B. VAT Registration Number: 209 4385 03

All Material Strictly © AG Wilson 2017

Social

Address:

A.G.WILSON Ltd

8 Upper Ballydougan Road, Portadown

BT63 5NU

Telephone: 028 3834 1255

Fax: 028 3834 3951

info@agwilsoncivilengineering.com

web design  |   shanweb.com